Offsite Prefab Building Modules
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.38 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.12%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
MEP Rough-In & Test
6 < 10/day
Limit: changeovers
MEP Rough-In & Test: capacity 6/day vs demand 10/day. Main limit: changeovers. Raw C/T 48.2 min, effective C/T 1.0 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€595,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
29.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Structural Steel & ME…
Frames, Pods & Ducting
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
BIM 4D + ERP
Project Job-Shop Push
CUSTOMER
Site General Contract…
10 modules/d
Takt: 45.0 min
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
14
1.40 d
Drag to reorder step 1
BAY 1 FRAME
1. Chassis Framing
×4
Push Flow
C/T
29.3 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
8 / 2d
OEE
82.4%
i
Insert a step here
+
I
12
1.20 d
Drag to reorder step 2
BAY 2 SHELL
2. Envelope & Insul…
×4
Push Flow
C/T
32.4 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
83.6%
i
Insert a step here
+
I
20
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. MEP Rough-In & T…
×5
BOTTLENECK
C/T
48.2 min
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
4 / 1d
OEE
66.7%
i
Insert a step here
+
I
10
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Interior Fit-Out
×4
FIFO Lane
C/T
36.0 min
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
3 / 1d
OEE
81.2%
i
FIFO
Insert a step here
+
I
6
0.60 d
Drag to reorder step 5
DISPATCH YARD
5. QA Sign-Off & Wr…
×2
FIFO Lane
C/T
24.3 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
89.0%
i
Insert a step at the end
+
I
8
0.80 d
Finished Goods
OUT
1.40 d
VA 29.3 min
1.20 d
VA 32.4 min
2.00 d
VA 48.2 min
1.00 d
VA 36.0 min
0.60 d
VA 24.3 min
0.80 d
Total Lead Time
7.38 d
VA Time
2.8 h
PCE
5.12%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step