Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.6 s
Lead Time (LT)
9.50 d
Value-Added
6.5 s
Efficiency (PCE)
0.00%
Bottleneck50°C Hot-Water Tank Leak Check
37,011 < 52,000/day
Limit: downtime
Quality (RTY)
91.5%
WIP Capital
€434,720
Carbon CO₂
4,049.8 t CO₂e/year