Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Airless Pipette Hyaluronic Anti-Aging Serum
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
15 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Monoblock Fill & Torque Drop
10,013 < 14,000/day
Limit: downtime
Monoblock Fill & Torque Drop: capacity 10,013/day vs demand 14,000/day. Main limit: downtime. Raw C/T 4.1 s, effective C/T 5.1 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€505,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,090.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Actives & Glass Dropp…
Hyaluronic Acid & Pipet…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Bulk Tank Micro Hold Push
CUSTOMER
Prestige Beauty Retai…
14,000 vials/d
Takt: 3.9 s
EDI / Daily Retail DC
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
23,800
1.70 d
Drag to reorder step 1
COMPOUNDING
1. High-Shear Vacuu…
×2
Push Flow
C/T
2.8 s
C/O
60 min
Availability
93%
Quality FPY
98.8%
Batch / EPEI
21000 / 2d
OEE
87.8%
i
Insert a step here
+
I
30,800
2.20 d
Drag to reorder step 2
QC LAB
2. Microbiology & V…
×2
Push Flow
C/T
3.1 s
C/O
15 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
21000 / 2d
OEE
89.3%
i
Insert a step here
+
I
25,200
1.80 d
SMED
SMED Quic…
Drag to reorder step 3
FILL LINE
3. Monoblock Fill &…
×3
BOTTLENECK
C/T
4.1 s
C/O
55 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
14000 / 2d
OEE
76.0%
i
Insert a step here
+
I
14,000
1.00 d
Drag to reorder step 4
DECORATION
4. Hot-Foil Stamp &…
×2
FIFO Lane
C/T
2.9 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
7000 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
11,200
0.80 d
Drag to reorder step 5
CASE END
5. Cellophane Wrap …
×2
Continuous Flow
C/T
2.2 s
C/O
10 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
5600 / 1d
OEE
93.7%
i
Insert a step at the end
+
I
28,000
2.00 d
Finished Goods
OUT
1.70 d
VA 2.8 s
2.20 d
VA 3.1 s
1.80 d
VA 4.1 s
1.00 d
VA 2.9 s
0.80 d
VA 2.2 s
2.00 d
Total Lead Time
9.50 d
VA Time
15 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step