Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Sulfate-Free Botanical Shampoo 400mL rPET
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.3 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.8 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
18-Head Flowmeter Fill & Cap
26,216 < 36,000/day
Limit: downtime
18-Head Flowmeter Fill & Cap: capacity 26,216/day vs demand 36,000/day. Main limit: downtime. Raw C/T 2.4 s, effective C/T 3.0 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€461,700
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,803.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Surfactant & rPET Sup…
Recycled Bottles & Flip…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Bulk Tank Micro Hold Push
CUSTOMER
Global Supermarkets
36,000 packs/d
Takt: 2.3 s
EDI / Daily Retail DC
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
61,200
1.70 d
Drag to reorder step 1
COMPOUNDING
1. Inline Cold-Mix …
×2
Push Flow
C/T
1.6 s
C/O
60 min
Availability
93%
Quality FPY
98.8%
Batch / EPEI
54000 / 2d
OEE
89.2%
i
Insert a step here
+
I
79,200
2.20 d
Drag to reorder step 2
QC LAB
2. Microbiota Prese…
×2
Push Flow
C/T
1.8 s
C/O
15 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
54000 / 2d
OEE
89.7%
i
Insert a step here
+
I
64,800
1.80 d
SMED
SMED Quic…
Drag to reorder step 3
FILL LINE
3. 18-Head Flowmete…
×3
BOTTLENECK
C/T
2.4 s
C/O
55 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
36000 / 2d
OEE
77.7%
i
Insert a step here
+
I
36,000
1.00 d
Drag to reorder step 4
DECORATION
4. Front/Back Clear…
×2
FIFO Lane
C/T
1.7 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
18000 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
28,800
0.80 d
Drag to reorder step 5
CASE END
5. Shrink 6-Pack & …
×2
Continuous Flow
C/T
1.3 s
C/O
10 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
14400 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
72,000
2.00 d
Finished Goods
OUT
1.70 d
VA 1.6 s
2.20 d
VA 1.8 s
1.80 d
VA 2.4 s
1.00 d
VA 1.7 s
0.80 d
VA 1.3 s
2.00 d
Total Lead Time
9.50 d
VA Time
8.8 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step