Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Biodegradable Viscose Baby & Micellar Wipe Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.7 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Horizontal Flowpack & Die-Cut
29,961 < 42,000/day
Limit: downtime
Horizontal Flowpack & Die-Cut: capacity 29,961/day vs demand 42,000/day. Main limit: downtime. Raw C/T 2.1 s, effective C/T 2.6 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€287,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3,271.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Spunlace Non-Woven Su…
100% Cellulosic Spunlac…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Bulk Tank Micro Hold Push
CUSTOMER
Retail & Pharmacy Cha…
42,000 packs/d
Takt: 1.9 s
EDI / Daily Retail DC
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
71,400
1.70 d
Drag to reorder step 1
COMPOUNDING
1. Multi-Web Slit &…
×2
Push Flow
C/T
1.4 s
C/O
60 min
Availability
93%
Quality FPY
98.8%
Batch / EPEI
63000 / 2d
OEE
89.2%
i
Insert a step here
+
I
92,400
2.20 d
Drag to reorder step 2
QC LAB
2. Preservative Lot…
×2
Push Flow
C/T
1.5 s
C/O
15 min
Availability
92%
Quality FPY
98.2%
Batch / EPEI
63000 / 2d
OEE
89.7%
i
Insert a step here
+
I
75,600
1.80 d
SMED
SMED Quic…
Drag to reorder step 3
FILL LINE
3. Horizontal Flowp…
×3
BOTTLENECK
C/T
2.1 s
C/O
55 min
Availability
84%
Quality FPY
96.4%
Batch / EPEI
42000 / 2d
OEE
77.7%
i
Insert a step here
+
I
42,000
1.00 d
Drag to reorder step 4
DECORATION
4. Hot-Melt Ultraso…
×2
FIFO Lane
C/T
1.5 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
21000 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
33,600
0.80 d
Drag to reorder step 5
CASE END
5. Case Packer & Pa…
×2
Continuous Flow
C/T
1.2 s
C/O
10 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
16800 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
84,000
2.00 d
Finished Goods
OUT
1.70 d
VA 1.4 s
2.20 d
VA 1.5 s
1.80 d
VA 2.1 s
1.00 d
VA 1.5 s
0.80 d
VA 1.2 s
2.00 d
Total Lead Time
9.50 d
VA Time
7.7 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step