Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
New Cloud Availability Zone Core Fleet Stand-Up
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.46 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
11.37%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Block & Object Storage Pool
3 < 4/day
Limit: downtime
Block & Object Storage Pool: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 4.0 h, effective C/T 5.0 h.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€960,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hyperscale Server Con…
Core Network, Auth & Bl…
Weekly Rack Drops · LT 8d
PRODUCTION CONTROL / ERP
Cloud Provisioning ERP
White-Space Commissioning Queue
CUSTOMER
Public Cloud Customers
4 batches/d
Takt: 3.8 h
EDI / Pod Handover
MRP / Weekly Rack Drops
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
STAGING FLOOR
1. Core Identity & …
×3
FIFO Lane
C/T
2.5 h
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
2 / 1d
OEE
90.5%
i
FIFO
Insert a step here
+
I
6
1.50 d
Drag to reorder step 2
FACILITY MECH
2. Spine-Leaf BGP F…
×4
Push Flow
C/T
3.1 h
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
85.8%
i
Insert a step here
+
I
9
2.25 d
SMED
Pre-Termi…
Drag to reorder step 3
POD NETWORK
3. Block & Object S…
×4
BOTTLENECK
C/T
4.0 h
C/O
25 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
2 / 1d
OEE
76.1%
i
Insert a step here
+
I
4
1.00 d
Drag to reorder step 4
NETOPS/SRE
4. Synthetic VM Str…
×2
FIFO Lane
C/T
2.8 h
C/O
10 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
1 / 1d
OEE
92.3%
i
FIFO
Insert a step here
+
I
2
0.50 d
Drag to reorder step 5
CLOUD HANDOVER
5. Public Region En…
×2
Continuous Flow
C/T
2.1 h
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
95.6%
i
Insert a step at the end
+
I
3
0.75 d
Finished Goods
OUT
1.50 d
VA 2.5 h
1.50 d
VA 3.1 h
2.25 d
VA 4.0 h
1.00 d
VA 2.8 h
0.50 d
VA 2.1 h
0.75 d
Total Lead Time
8.46 d
VA Time
14.4 h
PCE
11.37%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step