Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Immutable Air-Gap Backup Restore Test
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.54 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
49.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.46%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Malware Scan Inside Image
24 < 35/day
Limit: downtime
Malware Scan Inside Image: capacity 24/day vs demand 35/day. Main limit: downtime. Raw C/T 13.8 min, effective C/T 17.1 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€42,900
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
34.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Immutable S3 & Tape V…
VM & Database Snapshots
Weekly Rack Drops · LT 8d
PRODUCTION CONTROL / ERP
Backup Platform
White-Space Commissioning Queue
CUSTOMER
Enterprise CISO Compl…
35 batches/d
Takt: 12.9 min
EDI / Pod Handover
MRP / Weekly Rack Drops
★ PACEMAKER
IN
Insert a step at the start
+
I
49
1.40 d
Drag to reorder step 1
STAGING FLOOR
1. Snapshot Catalog…
×3
FIFO Lane
C/T
8.5 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
18 / 1d
OEE
87.5%
i
FIFO
Insert a step here
+
I
56
1.60 d
Drag to reorder step 2
FACILITY MECH
2. Isolated Cleanro…
×4
Push Flow
C/T
10.6 min
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
14 / 1d
OEE
79.8%
i
Insert a step here
+
I
77
2.20 d
SMED
Pre-Termi…
Drag to reorder step 3
POD NETWORK
3. Malware Scan Ins…
×4
BOTTLENECK
C/T
13.8 min
C/O
25 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
18 / 1d
OEE
71.9%
i
Insert a step here
+
I
32
0.91 d
Drag to reorder step 4
NETOPS/SRE
4. DB Consistency &…
×2
FIFO Lane
C/T
9.5 min
C/O
10 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
9 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
21
0.60 d
Drag to reorder step 5
CLOUD HANDOVER
5. Compliance Audit…
×2
Continuous Flow
C/T
7.2 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
7 / 1d
OEE
87.8%
i
Insert a step at the end
+
I
25
0.71 d
Finished Goods
OUT
1.40 d
VA 8.5 min
1.60 d
VA 10.6 min
2.20 d
VA 13.8 min
0.91 d
VA 9.5 min
0.60 d
VA 7.2 min
0.71 d
Total Lead Time
7.54 d
VA Time
49.5 min
PCE
1.46%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step