Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Enterprise Private Colocation Cage Handover
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.98 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
8.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Biometric Badge & CCTV Tie
4 < 6/day
Limit: downtime
Biometric Badge & CCTV Tie: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€281,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Mesh Caging & Dual-Fe…
A+B 400V Busbars & Locks
Weekly Rack Drops · LT 8d
PRODUCTION CONTROL / ERP
Colocation Provider / DC Ops
White-Space Commissioning Queue
CUSTOMER
Financial Colocation …
6 cases/d
Takt: 1.3 h
EDI / Pod Handover
MRP / Weekly Rack Drops
★ PACEMAKER
IN
Insert a step at the start
+
I
8
1.33 d
Drag to reorder step 1
STAGING FLOOR
1. Steel Mesh & Con…
×3
FIFO Lane
C/T
49.5 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
3 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
10
1.67 d
Drag to reorder step 2
FACILITY MECH
2. Dual A+B Whip & …
×4
Push Flow
C/T
1.0 h
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
77.8%
i
Insert a step here
+
I
13
2.17 d
SMED
Pre-Termi…
Drag to reorder step 3
POD NETWORK
3. Biometric Badge …
×4
BOTTLENECK
C/T
1.3 h
C/O
25 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
3 / 1d
OEE
71.6%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 4
NETOPS/SRE
4. Thermal Cold-Ais…
×2
FIFO Lane
C/T
55.5 min
C/O
10 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
2 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
4
0.67 d
Drag to reorder step 5
CLOUD HANDOVER
5. Customer Handove…
×2
Continuous Flow
C/T
42.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
4
0.67 d
Finished Goods
OUT
1.33 d
VA 49.5 min
1.67 d
VA 1.0 h
2.17 d
VA 1.3 h
0.83 d
VA 55.5 min
0.67 d
VA 42.0 min
0.67 d
Total Lead Time
7.98 d
VA Time
4.8 h
PCE
8.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step