Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.8 h
Lead Time (LT)
8.46 d
Value-Added
14.4 h
Efficiency (PCE)
11.37%
Bottleneck800G Transceiver Inspect & Seat
3 < 4/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€720,000
Carbon CO₂
4.0 t CO₂e/year