Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous SOC2 Type-II Automated Evidence Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.62 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Quarterly Access Review Lock
11 < 16/day
Limit: downtime
Quarterly Access Review Lock: capacity 11/day vs demand 16/day. Main limit: downtime. Raw C/T 30.1 min, effective C/T 37.4 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€56,640
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
15.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cloud Config, Git & I…
120 Control Evidence Lo…
Weekly Rack Drops · LT 8d
PRODUCTION CONTROL / ERP
Compliance Automation Platform
White-Space Commissioning Queue
CUSTOMER
Enterprise B2B Buyers
16 cases/d
Takt: 28.1 min
EDI / Pod Handover
MRP / Weekly Rack Drops
★ PACEMAKER
IN
Insert a step at the start
+
I
22
1.38 d
Drag to reorder step 1
STAGING FLOOR
1. API Control Drif…
×3
FIFO Lane
C/T
18.6 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
8 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
26
1.63 d
Drag to reorder step 2
FACILITY MECH
2. Exception Remedi…
×4
Push Flow
C/T
23.1 min
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
79.1%
i
Insert a step here
+
I
35
2.19 d
SMED
Pre-Termi…
Drag to reorder step 3
POD NETWORK
3. Quarterly Access…
×4
BOTTLENECK
C/T
30.1 min
C/O
25 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
8 / 1d
OEE
71.6%
i
Insert a step here
+
I
14
0.88 d
Drag to reorder step 4
NETOPS/SRE
4. External CPA Aud…
×2
FIFO Lane
C/T
20.8 min
C/O
10 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
4 / 1d
OEE
85.0%
i
FIFO
Insert a step here
+
I
10
0.63 d
Drag to reorder step 5
CLOUD HANDOVER
5. Signed SOC2 Repo…
×2
Continuous Flow
C/T
15.8 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
3 / 1d
OEE
87.3%
i
Insert a step at the end
+
I
11
0.69 d
Finished Goods
OUT
1.38 d
VA 18.6 min
1.63 d
VA 23.1 min
2.19 d
VA 30.1 min
0.88 d
VA 20.8 min
0.63 d
VA 15.8 min
0.69 d
Total Lead Time
7.62 d
VA Time
1.8 h
PCE
3.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step