Data Center High-Rate VRLA / Lithium String Swap
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.65 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
New Torqued Busbar & Thermal
8 < 12/day
Limit: downtime
New Torqued Busbar & Thermal: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 40.1 min, effective C/T 49.8 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€127,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
480V DC Battery Cabin…
Tested High-Rate Cells
Weekly Rack Drops · LT 8d
PRODUCTION CONTROL / ERP
Facility Maintenance
White-Space Commissioning Queue
CUSTOMER
Mission-Critical Faci…
12 cases/d
Takt: 37.5 min
EDI / Pod Handover
MRP / Weekly Rack Drops
★ PACEMAKER
IN
Insert a step at the start
+
I
17
1.42 d
Drag to reorder step 1
STAGING FLOOR
1. Single-String DC…
×3
FIFO Lane
C/T
24.8 min
C/O
15 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
6 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
19
1.58 d
Drag to reorder step 2
FACILITY MECH
2. Old Cell Pull & …
×4
Push Flow
C/T
30.8 min
C/O
20 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
80.2%
i
Insert a step here
+
I
26
2.17 d
SMED
Pre-Termi…
Drag to reorder step 3
POD NETWORK
3. New Torqued Busb…
×4
BOTTLENECK
C/T
40.1 min
C/O
25 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
6 / 1d
OEE
71.6%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 4
NETOPS/SRE
4. Equalize Charge …
×2
FIFO Lane
C/T
27.8 min
C/O
10 min
Availability
95%
Quality FPY
98.2%
Batch / EPEI
3 / 1d
OEE
85.0%
i
FIFO
Insert a step here
+
I
7
0.58 d
Drag to reorder step 5
CLOUD HANDOVER
5. Parallel Re-Sync…
×2
Continuous Flow
C/T
21.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
2 / 1d
OEE
86.1%
i
Insert a step at the end
+
I
8
0.67 d
Finished Goods
OUT
1.42 d
VA 24.8 min
1.58 d
VA 30.8 min
2.17 d
VA 40.1 min
0.92 d
VA 27.8 min
0.58 d
VA 21.0 min
0.67 d
Total Lead Time
7.65 d
VA Time
2.4 h
PCE
4.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step