Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.0 min
Lead Time (LT)
10.0 d
Value-Added
7.9 min
Efficiency (PCE)
0.09%
BottleneckUHMWPE Autoclave Laminate
319 < 450/day
Limit: downtime
Quality (RTY)
87.7%
WIP Capital
€1,080,000
Carbon CO₂
596.4 t CO₂e/year