Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
MIL-STD Software-Defined Tactical Manpack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
37.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.41%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
NSA Type-1 Crypto Fill
67 < 95/day
Limit: downtime
NSA Type-1 Crypto Fill: capacity 67/day vs demand 95/day. Main limit: downtime. Raw C/T 10.1 min, effective C/T 12.7 min.
Quality (RTY)
87.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,854,450
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
125.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
RF module & Al castin…
Milled Sealed Cases & F…
Weekly · LT 15d
PRODUCTION CONTROL / ERP
Defense ERP
MIL-STD Lot Qualification
CUSTOMER
Allied Ground Forces
95 units/d
Takt: 9.5 min
EDI / Milestone Escort
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
190
2.00 d
Drag to reorder step 1
STRUCT PREP
1. Precision RF Dec…
×2
Push Flow
C/T
6.5 min
C/O
35 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
143 / 2d
OEE
91.6%
i
Insert a step here
+
I
171
1.80 d
Drag to reorder step 2
OPTICS ROOM
2. Laser-Etched Mil…
×2
Push Flow
C/T
8.0 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
76 / 2d
OEE
84.2%
i
Insert a step here
+
I
238
2.51 d
QUALITY
Digital T…
Drag to reorder step 3
INTEG CELL
3. NSA Type-1 Crypt…
×3
BOTTLENECK
C/T
10.1 min
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
95 / 2d
OEE
75.7%
i
Insert a step here
+
I
133
1.40 d
Drag to reorder step 4
QUAL LAB
4. Water Immersion …
×2
FIFO Lane
C/T
7.4 min
C/O
25 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
76 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
76
0.80 d
Drag to reorder step 5
ACCEPTANCE
5. ECCM Hopping Ran…
×2
Continuous Flow
C/T
5.5 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
24 / 1d
OEE
92.0%
i
Insert a step at the end
+
I
143
1.51 d
Finished Goods
OUT
2.00 d
VA 6.5 min
1.80 d
VA 8.0 min
2.51 d
VA 10.1 min
1.40 d
VA 7.4 min
0.80 d
VA 5.5 min
1.51 d
Total Lead Time
10.1 d
VA Time
37.4 min
PCE
0.41%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step