Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Airborne Multi-Spectral EOTS Targeting Pod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Rangefinder Bore-Sight
8 < 12/day
Limit: downtime
Laser Rangefinder Bore-Sight: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 40.1 min, effective C/T 50.4 min.
Quality (RTY)
87.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,509,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
15.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cooled infrared detec…
ZnS Lenses & InSb Dewars
Weekly · LT 15d
PRODUCTION CONTROL / ERP
Aerospace ERP
MIL-STD Lot Qualification
CUSTOMER
Defense Flight Line
12 units/d
Takt: 37.5 min
EDI / Milestone Escort
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
24
2.00 d
Drag to reorder step 1
STRUCT PREP
1. Precision Ball G…
×2
Push Flow
C/T
25.5 min
C/O
35 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
18 / 2d
OEE
89.2%
i
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
OPTICS ROOM
2. ZnS Infrared Opt…
×2
Push Flow
C/T
31.5 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
10 / 2d
OEE
80.8%
i
Insert a step here
+
I
30
2.50 d
QUALITY
Digital T…
Drag to reorder step 3
INTEG CELL
3. Laser Rangefinde…
×3
BOTTLENECK
C/T
40.1 min
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
12 / 2d
OEE
71.7%
i
Insert a step here
+
I
17
1.42 d
Drag to reorder step 4
QUAL LAB
4. Dry N2 Purge & B…
×2
FIFO Lane
C/T
29.3 min
C/O
25 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
10 / 1d
OEE
83.8%
i
FIFO
Insert a step here
+
I
10
0.83 d
Drag to reorder step 5
ACCEPTANCE
5. MIL Environmenta…
×2
Continuous Flow
C/T
21.8 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
3 / 1d
OEE
87.7%
i
Insert a step at the end
+
I
18
1.50 d
Finished Goods
OUT
2.00 d
VA 25.5 min
1.83 d
VA 31.5 min
2.50 d
VA 40.1 min
1.42 d
VA 29.3 min
0.83 d
VA 21.8 min
1.50 d
Total Lead Time
10.4 d
VA Time
2.5 h
PCE
3.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step