Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.9 h
Lead Time (LT)
11.0 d
Value-Added
7.4 h
Efficiency (PCE)
8.99%
BottleneckDielectric Coolant Flush
3 < 4/day
Limit: downtime
Quality (RTY)
87.7%
WIP Capital
€2,600,000
Carbon CO₂
5.3 t CO₂e/year