Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
S-Band Naval Solid-State Phased Radar Mast
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
8.99%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Dielectric Coolant Flush
3 < 4/day
Limit: downtime
Dielectric Coolant Flush: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.5 h.
Quality (RTY)
87.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,600,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Phased-array module s…
Liquid-Cooled S-Band Ti…
Weekly · LT 15d
PRODUCTION CONTROL / ERP
Defense ERP
MIL-STD Lot Qualification
CUSTOMER
Destroyer Integration…
4 units/d
Takt: 1.9 h
EDI / Milestone Escort
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
8
2.00 d
Drag to reorder step 1
STRUCT PREP
1. Al Alloy Structu…
×2
Push Flow
C/T
1.3 h
C/O
35 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
6 / 2d
OEE
89.2%
i
Insert a step here
+
I
7
1.75 d
Drag to reorder step 2
OPTICS ROOM
2. T/R Module Array…
×2
Push Flow
C/T
1.6 h
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
3 / 2d
OEE
80.0%
i
Insert a step here
+
I
10
2.50 d
QUALITY
Digital T…
Drag to reorder step 3
INTEG CELL
3. Dielectric Coola…
×3
BOTTLENECK
C/T
2.0 h
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
4 / 2d
OEE
71.7%
i
Insert a step here
+
I
6
1.50 d
Drag to reorder step 4
QUAL LAB
4. Rotary Joint RF …
×2
FIFO Lane
C/T
1.5 h
C/O
25 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
83.1%
i
FIFO
Insert a step here
+
I
3
0.75 d
Drag to reorder step 5
ACCEPTANCE
5. Far-Field Mariti…
×2
Continuous Flow
C/T
1.1 h
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
1 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
6
1.50 d
Finished Goods
OUT
2.00 d
VA 1.3 h
1.75 d
VA 1.6 h
2.50 d
VA 2.0 h
1.50 d
VA 1.5 h
0.75 d
VA 1.1 h
1.50 d
Total Lead Time
11.0 d
VA Time
7.4 h
PCE
8.99%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step