Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Sub-Safe Nickel-Aluminum-Bronze Hull Valve
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.62%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cobalt-Alloy Seat Lap & Stem Fit
16 < 24/day
Limit: downtime
Cobalt-Alloy Seat Lap & Stem Fit: capacity 16/day vs demand 24/day. Main limit: downtime. Raw C/T 20.1 min, effective C/T 25.2 min.
Quality (RTY)
87.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,104,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
31.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Nickel-aluminum-bronz…
NAB Cast Bodies & Titan…
Weekly · LT 15d
PRODUCTION CONTROL / ERP
Defense ERP
MIL-STD Lot Qualification
CUSTOMER
Naval Nuclear Yards
24 units/d
Takt: 18.8 min
EDI / Milestone Escort
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
48
2.00 d
Drag to reorder step 1
STRUCT PREP
1. 100% Radiography…
×2
Push Flow
C/T
12.8 min
C/O
35 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
36 / 2d
OEE
89.2%
i
Insert a step here
+
I
43
1.79 d
Drag to reorder step 2
OPTICS ROOM
2. CNC Globe Seat &…
×2
Push Flow
C/T
15.8 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
19 / 2d
OEE
80.4%
i
Insert a step here
+
I
60
2.50 d
QUALITY
Digital T…
Drag to reorder step 3
INTEG CELL
3. Cobalt-Alloy Sea…
×3
BOTTLENECK
C/T
20.1 min
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
24 / 2d
OEE
71.7%
i
Insert a step here
+
I
34
1.42 d
Drag to reorder step 4
QUAL LAB
4. Shock-Grade 901D…
×2
FIFO Lane
C/T
14.6 min
C/O
25 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
19 / 1d
OEE
83.5%
i
FIFO
Insert a step here
+
I
19
0.79 d
Drag to reorder step 5
ACCEPTANCE
5. SUBSAFE Certifie…
×2
Continuous Flow
C/T
10.9 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
6 / 1d
OEE
87.7%
i
Insert a step at the end
+
I
36
1.50 d
Finished Goods
OUT
2.00 d
VA 12.8 min
1.79 d
VA 15.8 min
2.50 d
VA 20.1 min
1.42 d
VA 14.6 min
0.79 d
VA 10.9 min
1.50 d
Total Lead Time
10.2 d
VA Time
1.2 h
PCE
1.62%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step