Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Autonomous Unmanned Surface Patrol Craft
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
7.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Twin Jet Drive & Genset Fit
3 < 5/day
Limit: downtime
Twin Jet Drive & Genset Fit: capacity 3/day vs demand 5/day. Main limit: downtime. Raw C/T 1.6 h, effective C/T 2.0 h.
Quality (RTY)
87.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,122,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Marine Composite Kits
E-Glass/Carbon & Waterj…
Weekly · LT 15d
PRODUCTION CONTROL / ERP
Business ERP
MIL-STD Lot Qualification
CUSTOMER
Coastal Defense Agenc…
5 units/d
Takt: 1.5 h
EDI / Milestone Escort
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
10
2.00 d
Drag to reorder step 1
STRUCT PREP
1. Twin-Shell Hull …
×2
Push Flow
C/T
1.0 h
C/O
35 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
8 / 2d
OEE
89.5%
i
Insert a step here
+
I
9
1.80 d
Drag to reorder step 2
OPTICS ROOM
2. Foam Buoyancy & …
×2
Push Flow
C/T
1.3 h
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
4 / 2d
OEE
80.5%
i
Insert a step here
+
I
13
2.60 d
QUALITY
Digital T…
Drag to reorder step 3
INTEG CELL
3. Twin Jet Drive &…
×3
BOTTLENECK
C/T
1.6 h
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
5 / 2d
OEE
71.7%
i
Insert a step here
+
I
7
1.40 d
Drag to reorder step 4
QUAL LAB
4. Autopilot Radar …
×2
FIFO Lane
C/T
1.2 h
C/O
25 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
83.6%
i
FIFO
Insert a step here
+
I
4
0.80 d
Drag to reorder step 5
ACCEPTANCE
5. Sea-Trial Autono…
×2
Continuous Flow
C/T
52.2 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
1 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
8
1.60 d
Finished Goods
OUT
2.00 d
VA 1.0 h
1.80 d
VA 1.3 h
2.60 d
VA 1.6 h
1.40 d
VA 1.2 h
0.80 d
VA 52.2 min
1.60 d
Total Lead Time
11.0 d
VA Time
5.9 h
PCE
7.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step