Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Dual-System Vocational Apprenticeship Certification
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.74 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
17.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Capstone Jury Project Eval
55 < 95/day
Limit: changeovers
Capstone Jury Project Eval: capacity 55/day vs demand 95/day. Main limit: changeovers. Raw C/T 5.1 min, effective C/T 6.8 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€56,236
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Host Plants & Trade S…
Workshop Logbooks & Pro…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
VocationalERP
Volunteer Reviewer Unbounded Queue
CUSTOMER
Certified Technicians
95 files/d
Takt: 4.7 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
133
1.40 d
Drag to reorder step 1
ADMISSIONS/ED
1. Employer Contrac…
×2
FIFO Lane
C/T
3.0 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
24 / 1d
OEE
84.0%
i
FIFO
Insert a step here
+
I
171
1.80 d
Drag to reorder step 2
SCREENING
2. Mid-Term Practic…
×2
Push Flow
C/T
3.6 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
24 / 1d
OEE
82.0%
i
Insert a step here
+
I
361
3.80 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Capstone Jury Pr…
×3
BOTTLENECK
C/T
5.1 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
19 / 1d
OEE
62.7%
i
Insert a step here
+
I
86
0.91 d
Drag to reorder step 4
REGISTRAR
4. Chamber Written …
×2
FIFO Lane
C/T
3.3 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
14 / 1d
OEE
86.6%
i
FIFO
Insert a step here
+
I
38
0.40 d
Drag to reorder step 5
PUBLISH/ENROL
5. Master Craft Cre…
×1
Continuous Flow
C/T
2.3 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
10 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
38
0.40 d
Finished Goods
OUT
1.40 d
VA 3.0 min
1.80 d
VA 3.6 min
3.80 d
VA 5.1 min
0.91 d
VA 3.3 min
0.40 d
VA 2.3 min
0.40 d
Total Lead Time
8.74 d
VA Time
17.3 min
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step