Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
University Wet Chemistry Lab Annual Biosafety Audit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.71%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
PI Staff Training Expiry Check
14 < 24/day
Limit: changeovers
PI Staff Training Expiry Check: capacity 14/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.3 min, effective C/T 26.9 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€38,850
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Chemical Inventory Tr…
SDS & Fume Hood Logs
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
EHS Management Software
Volunteer Reviewer Unbounded Queue
CUSTOMER
Campus EHS Office
24 rooms/d
Takt: 18.8 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
34
1.42 d
Drag to reorder step 1
ADMISSIONS/ED
1. Chemical Invento…
×2
FIFO Lane
C/T
12.0 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
6 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
43
1.79 d
Drag to reorder step 2
SCREENING
2. Fume-Hood Face V…
×2
Push Flow
C/T
14.3 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
6 / 1d
OEE
81.9%
i
Insert a step here
+
I
91
3.79 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. PI Staff Trainin…
×3
BOTTLENECK
C/T
20.3 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
5 / 1d
OEE
63.2%
i
Insert a step here
+
I
22
0.92 d
Drag to reorder step 4
REGISTRAR
4. 30-Day Violation…
×2
FIFO Lane
C/T
13.1 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
10
0.42 d
Drag to reorder step 5
PUBLISH/ENROL
5. Clear Bio-Permit…
×1
Continuous Flow
C/T
9.0 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
2 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
10
0.42 d
Finished Goods
OUT
1.42 d
VA 12.0 min
1.79 d
VA 14.3 min
3.79 d
VA 20.3 min
0.92 d
VA 13.1 min
0.42 d
VA 9.0 min
0.42 d
Total Lead Time
8.90 d
VA Time
1.1 h
PCE
1.71%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step