Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
National High-Stakes Digital Exam Blind Grading
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
41 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Seeded Gold-Standard Audit
3,052 < 4,800/day
Limit: downtime
Seeded Gold-Standard Audit: capacity 3,052/day vs demand 4,800/day. Main limit: downtime. Raw C/T 12 s, effective C/T 16 s.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€133,632
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
187.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Regional Exam Centers
Scanned Booklet PDFs
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
AssessCloud
Volunteer Reviewer Unbounded Queue
CUSTOMER
Graduating Students
4,800 files/d
Takt: 11 s
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
6,720
1.40 d
Drag to reorder step 1
ADMISSIONS/ED
1. High-Speed Bookl…
×2
FIFO Lane
C/T
7.2 s
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
1200 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
8,640
1.80 d
Drag to reorder step 2
SCREENING
2. Item-Level Rando…
×2
Push Flow
C/T
8.6 s
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
1200 / 1d
OEE
85.0%
i
Insert a step here
+
I
18,240
3.80 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Seeded Gold-Stan…
×3
BOTTLENECK
C/T
12 s
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
960 / 1d
OEE
69.0%
i
Insert a step here
+
I
4,320
0.90 d
Drag to reorder step 4
REGISTRAR
4. 15% Variance Sen…
×2
FIFO Lane
C/T
7.9 s
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
720 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
1,920
0.40 d
Drag to reorder step 5
PUBLISH/ENROL
5. Scaled Score Uni…
×1
Continuous Flow
C/T
5.4 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
480 / 1d
OEE
96.2%
i
Insert a step at the end
+
I
1,920
0.40 d
Finished Goods
OUT
1.40 d
VA 7.2 s
1.80 d
VA 8.6 s
3.80 d
VA 12 s
0.90 d
VA 7.9 s
0.40 d
VA 5.4 s
0.40 d
Total Lead Time
8.70 d
VA Time
41 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step