Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
National Science Research Grant Peer-Review
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
16.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.77 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
58.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.49%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Panel Scoring & Tie-Break
16 < 28/day
Limit: changeovers
Panel Scoring & Tie-Break: capacity 16/day vs demand 28/day. Main limit: changeovers. Raw C/T 17.4 min, effective C/T 23.1 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€116,160
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Principal Investigato…
20-Page Research Propos…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
Grant Management Cloud
Volunteer Reviewer Unbounded Queue
CUSTOMER
University Labs & PIs
28 files/d
Takt: 16.1 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
39
1.39 d
Drag to reorder step 1
ADMISSIONS/ED
1. Budget & Ethics …
×2
FIFO Lane
C/T
10.3 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
7 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
50
1.79 d
Drag to reorder step 2
SCREENING
2. 3-Peer External …
×2
Push Flow
C/T
12.2 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
7 / 1d
OEE
81.9%
i
Insert a step here
+
I
106
3.79 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Panel Scoring & …
×3
BOTTLENECK
C/T
17.4 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
6 / 1d
OEE
63.5%
i
Insert a step here
+
I
25
0.89 d
Drag to reorder step 4
REGISTRAR
4. Award Contract &…
×2
FIFO Lane
C/T
11.3 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
86.4%
i
FIFO
Insert a step here
+
I
11
0.39 d
Drag to reorder step 5
PUBLISH/ENROL
5. Tranche #1 Lab G…
×1
Continuous Flow
C/T
7.7 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
3 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
11
0.39 d
Finished Goods
OUT
1.39 d
VA 10.3 min
1.79 d
VA 12.2 min
3.79 d
VA 17.4 min
0.89 d
VA 11.3 min
0.39 d
VA 7.7 min
0.39 d
Total Lead Time
8.77 d
VA Time
58.8 min
PCE
1.49%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step