Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
University Hospital Clinical Trial IRB Ethics Review
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Full IRB Board Monthly Vote
11 < 18/day
Limit: changeovers
Full IRB Board Monthly Vote: capacity 11/day vs demand 18/day. Main limit: changeovers. Raw C/T 27.0 min, effective C/T 35.9 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€99,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Clinical Investigators
Consent Forms & Protoco…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
IRB Cloud
Volunteer Reviewer Unbounded Queue
CUSTOMER
Medical Research Teams
18 files/d
Takt: 25.0 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
25
1.39 d
Drag to reorder step 1
ADMISSIONS/ED
1. Administrative P…
×2
FIFO Lane
C/T
16.0 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
5 / 1d
OEE
84.3%
i
FIFO
Insert a step here
+
I
32
1.78 d
Drag to reorder step 2
SCREENING
2. Biostat & Safety…
×2
Push Flow
C/T
19.0 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
5 / 1d
OEE
82.5%
i
Insert a step here
+
I
68
3.78 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Full IRB Board M…
×3
BOTTLENECK
C/T
27.0 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
4 / 1d
OEE
63.9%
i
Insert a step here
+
I
16
0.89 d
Drag to reorder step 4
REGISTRAR
4. Stipulation Revi…
×2
FIFO Lane
C/T
17.5 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
7
0.39 d
Drag to reorder step 5
PUBLISH/ENROL
5. Official Study O…
×1
Continuous Flow
C/T
12.0 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
2 / 1d
OEE
94.5%
i
Insert a step at the end
+
I
7
0.39 d
Finished Goods
OUT
1.39 d
VA 16.0 min
1.78 d
VA 19.0 min
3.78 d
VA 27.0 min
0.89 d
VA 17.5 min
0.39 d
VA 12.0 min
0.39 d
Total Lead Time
8.81 d
VA Time
1.5 h
PCE
2.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step