Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Open-Access Peer-Reviewed Scientific Publishing
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.76 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.64%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
2-Round Revision Arbitration
38 < 65/day
Limit: changeovers
2-Round Revision Arbitration: capacity 38/day vs demand 65/day. Main limit: changeovers. Raw C/T 7.5 min, effective C/T 9.9 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€110,370
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Global Academic Autho…
LaTeX/Word Manuscripts …
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
Manuscript Submission System
Volunteer Reviewer Unbounded Queue
CUSTOMER
Researchers & Indexin…
65 files/d
Takt: 6.9 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
91
1.40 d
Drag to reorder step 1
ADMISSIONS/ED
1. Similarity Check…
×2
FIFO Lane
C/T
4.4 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
16 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
117
1.80 d
Drag to reorder step 2
SCREENING
2. Handling Editor …
×2
Push Flow
C/T
5.3 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
16 / 1d
OEE
81.8%
i
Insert a step here
+
I
247
3.80 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. 2-Round Revision…
×3
BOTTLENECK
C/T
7.5 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
13 / 1d
OEE
62.7%
i
Insert a step here
+
I
59
0.91 d
Drag to reorder step 4
REGISTRAR
4. XML JATS Typeset…
×2
FIFO Lane
C/T
4.9 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
10 / 1d
OEE
86.9%
i
FIFO
Insert a step here
+
I
26
0.40 d
Drag to reorder step 5
PUBLISH/ENROL
5. DOI Registry & I…
×1
Continuous Flow
C/T
3.3 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
7 / 1d
OEE
94.3%
i
Insert a step at the end
+
I
26
0.40 d
Finished Goods
OUT
1.40 d
VA 4.4 min
1.80 d
VA 5.3 min
3.80 d
VA 7.5 min
0.91 d
VA 4.9 min
0.40 d
VA 3.3 min
0.40 d
Total Lead Time
8.76 d
VA Time
25.4 min
PCE
0.64%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step