Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Rare Archive Robotic Book Digitization & OCR
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
113 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.72 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Deskew, Crop & Multilingual OCR
139 < 240/day
Limit: changeovers
Deskew, Crop & Multilingual OCR: capacity 139/day vs demand 240/day. Main limit: changeovers. Raw C/T 2.0 min, effective C/T 2.7 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€50,112
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
9.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Special Collection Va…
Fragile 18th-Century Vo…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
ArchiveMES
Volunteer Reviewer Unbounded Queue
CUSTOMER
Global Digital Resear…
240 units/d
Takt: 113 s
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
336
1.40 d
Drag to reorder step 1
ADMISSIONS/ED
1. Conservator Spin…
×2
FIFO Lane
C/T
72 s
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
60 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
432
1.80 d
Drag to reorder step 2
SCREENING
2. V-Cradle Dual-Ca…
×2
Push Flow
C/T
86 s
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
60 / 1d
OEE
81.9%
i
Insert a step here
+
I
912
3.80 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Deskew, Crop & M…
×3
BOTTLENECK
C/T
2.0 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
48 / 1d
OEE
62.7%
i
Insert a step here
+
I
216
0.90 d
Drag to reorder step 4
REGISTRAR
4. MARC21 & IIIF Me…
×2
FIFO Lane
C/T
79 s
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
36 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
96
0.40 d
Drag to reorder step 5
PUBLISH/ENROL
5. Vault Return & O…
×1
Continuous Flow
C/T
54 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
24 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
96
0.40 d
Finished Goods
OUT
1.40 d
VA 72 s
1.80 d
VA 86 s
3.80 d
VA 2.0 min
0.90 d
VA 79 s
0.40 d
VA 54 s
0.40 d
Total Lead Time
8.72 d
VA Time
6.9 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step