Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Online University Degree MOOC Video Production
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.14 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.34%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Edit, Captions & L10n Subtit
7 < 12/day
Limit: changeovers
Edit, Captions & L10n Subtit: capacity 7/day vs demand 12/day. Main limit: changeovers. Raw C/T 40.5 min, effective C/T 53.8 min.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€196,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
0.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Faculty Authors & Ins…
Scripts, Decks & Code L…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
EdTech Studio
Volunteer Reviewer Unbounded Queue
CUSTOMER
Global Online Learners
12 cases/d
Takt: 37.5 min
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
17
1.42 d
Drag to reorder step 1
ADMISSIONS/ED
1. Instructional De…
×2
FIFO Lane
C/T
24.0 min
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
3 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
SCREENING
2. 4K Green-Screen …
×2
Push Flow
C/T
28.5 min
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
3 / 1d
OEE
81.9%
i
Insert a step here
+
I
46
3.83 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Edit, Captions &…
×3
BOTTLENECK
C/T
40.5 min
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
2 / 1d
OEE
60.2%
i
Insert a step here
+
I
11
0.92 d
Drag to reorder step 4
REGISTRAR
4. SCORM Quiz & San…
×2
FIFO Lane
C/T
26.3 min
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
5
0.42 d
Drag to reorder step 5
PUBLISH/ENROL
5. LMS Public Cohor…
×1
Continuous Flow
C/T
18.0 min
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
1 / 1d
OEE
98.0%
i
Insert a step at the end
+
I
5
0.42 d
Finished Goods
OUT
1.42 d
VA 24.0 min
1.83 d
VA 28.5 min
3.83 d
VA 40.5 min
0.92 d
VA 26.3 min
0.42 d
VA 18.0 min
0.42 d
Total Lead Time
9.14 d
VA Time
2.3 h
PCE
3.34%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step