Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
University Undergraduate Admission Decision Loop
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
64 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Holistic Faculty/Reader Score
245 < 420/day
Limit: changeovers
Holistic Faculty/Reader Score: capacity 245/day vs demand 420/day. Main limit: changeovers. Raw C/T 69 s, effective C/T 92 s.
Quality (RTY)
73.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€102,312
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-School Grade Reg…
Transcripts, Essays & R…
Rolling Academic · LT 3d
PRODUCTION CONTROL / ERP
Student Admissions CRM
Volunteer Reviewer Unbounded Queue
CUSTOMER
Prospective Freshmen
420 files/d
Takt: 64 s
EDI / Term / Publish
MRP / Rolling Academic
★ PACEMAKER
IN
Insert a step at the start
+
I
588
1.40 d
Drag to reorder step 1
ADMISSIONS/ED
1. Transcript & Tes…
×2
FIFO Lane
C/T
41 s
C/O
5 min
Availability
96%
Quality FPY
91.5%
Batch / EPEI
105 / 1d
OEE
83.9%
i
FIFO
Insert a step here
+
I
756
1.80 d
Drag to reorder step 2
SCREENING
2. Credential Equiv…
×2
Push Flow
C/T
49 s
C/O
8 min
Availability
94%
Quality FPY
93.8%
Batch / EPEI
105 / 1d
OEE
81.9%
i
Insert a step here
+
I
1,596
3.80 d
FLOW
Structure…
Drag to reorder step 3
PEER PANEL
3. Holistic Faculty…
×3
BOTTLENECK
C/T
69 s
C/O
15 min
Availability
85%
Quality FPY
88.5%
Batch / EPEI
84 / 1d
OEE
62.7%
i
Insert a step here
+
I
378
0.90 d
Drag to reorder step 4
REGISTRAR
4. Scholarship Aid …
×2
FIFO Lane
C/T
45 s
C/O
5 min
Availability
96%
Quality FPY
97.6%
Batch / EPEI
63 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
168
0.40 d
Drag to reorder step 5
PUBLISH/ENROL
5. Portal Offer & D…
×1
Continuous Flow
C/T
31 s
C/O
2 min
Availability
99%
Quality FPY
99.4%
Batch / EPEI
42 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
168
0.40 d
Finished Goods
OUT
1.40 d
VA 41 s
1.80 d
VA 49 s
3.80 d
VA 69 s
0.90 d
VA 45 s
0.40 d
VA 31 s
0.40 d
Total Lead Time
8.71 d
VA Time
3.9 min
PCE
0.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step