Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
5nm/3nm FinFET 300mm Wafer Logic Fab Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
68 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
EUV Multi-Pattern Litho
854 < 1,200/day
Limit: downtime
EUV Multi-Pattern Litho: capacity 854/day vs demand 1,200/day. Main limit: downtime. Raw C/T 73 s, effective C/T 93 s.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€34,272,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,847.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon Wafer Supplier
300mm Epitaxial Si Wafe…
2x / week · LT 14d
PRODUCTION CONTROL / ERP
Fab MES
Photolitho Bottleneck Queue
CUSTOMER
Fabless Cloud Hypersc…
1,200 batches/d
Takt: 68 s
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,920
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. Epi Clean & Gate…
×1
FIFO Lane
C/T
47 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
1200 / 2d
OEE
93.7%
i
FIFO
Insert a step here
+
I
3,120
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. EUV Multi-Patter…
×2
BOTTLENECK
C/T
73 s
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
1440 / 2d
OEE
77.0%
i
Insert a step here
+
I
2,280
1.90 d
Drag to reorder step 3
ETCH BAY
3. RIE Plasma & Fin…
×2
Push Flow
C/T
57 s
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
960 / 2d
OEE
85.6%
i
Insert a step here
+
I
1,800
1.50 d
Drag to reorder step 4
METAL CMP
4. Cu Damascene & C…
×2
Push Flow
C/T
53 s
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
720 / 1d
OEE
87.9%
i
Insert a step here
+
I
1,320
1.10 d
Drag to reorder step 5
DIE SORT
5. Electrical Probe…
×2
FIFO Lane
C/T
43 s
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
480 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
1,800
1.50 d
Finished Goods
OUT
1.60 d
VA 47 s
2.60 d
VA 73 s
1.90 d
VA 57 s
1.50 d
VA 53 s
1.10 d
VA 43 s
1.50 d
Total Lead Time
10.2 d
VA Time
4.6 min
PCE
0.03%