Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Blue-Laser Metrology Handheld 3D Scanner
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.28 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
23.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.70%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cross-Line Blue Laser Mount
50 < 75/day
Limit: changeovers
Cross-Line Blue Laser Mount: capacity 50/day vs demand 75/day. Main limit: changeovers. Raw C/T 6.4 min, effective C/T 7.8 min.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,571,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carbon Frame & Global…
14-Line Cross Blue Lase…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
ERP
SKU Firmware Lot Batch
CUSTOMER
Auto & Aero Quality L…
75 units/d
Takt: 6.0 min
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
98
1.31 d
Drag to reorder step 1
PREP CELL
1. Carbon Rigid Ste…
×2
Push Flow
C/T
3.8 min
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
45 / 1d
OEE
89.7%
i
Insert a step here
+
I
90
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. Dual Global-Shut…
×4
FIFO Lane
C/T
5.0 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
23 / 1d
OEE
82.9%
i
FIFO
Insert a step here
+
I
120
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. Cross-Line Blue …
×3
BOTTLENECK
C/T
6.4 min
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
19 / 1d
OEE
71.1%
i
Insert a step here
+
I
68
0.91 d
Drag to reorder step 4
FINISH LINE
4. Thermally Stable…
×2
FIFO Lane
C/T
4.4 min
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
19 / 1d
OEE
87.3%
i
FIFO
Insert a step here
+
I
53
0.71 d
Drag to reorder step 5
RETAIL PACK
5. NIST Sphere Volu…
×3
Continuous Flow
C/T
3.4 min
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
15 / 1d
OEE
91.1%
i
Insert a step at the end
+
I
113
1.51 d
Finished Goods
OUT
1.31 d
VA 3.8 min
1.20 d
VA 5.0 min
1.60 d
VA 6.4 min
0.91 d
VA 4.4 min
0.71 d
VA 3.4 min
1.51 d
Total Lead Time
7.28 d
VA Time
23.1 min
PCE
0.70%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step