Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.8 min
Lead Time (LT)
7.41 d
Value-Added
11.0 min
Efficiency (PCE)
0.17%
BottleneckVapor Phase Reflow Oven
227 < 320/day
Limit: downtime
Quality (RTY)
88.8%
WIP Capital
€805,120
Carbon CO₂
24.9 t CO₂e/year