Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
39 s
Lead Time (LT)
7.40 d
Value-Added
2.5 min
Efficiency (PCE)
0.03%
BottleneckVacuum Void-Free Reflow
1,530 < 2,100/day
Limit: downtime
Quality (RTY)
88.8%
WIP Capital
€1,056,720
Carbon CO₂
163.5 t CO₂e/year