Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Rigid-Flex Polyimide Satellite Bus Board
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.49 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
39.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vapor Phase Reflow & Wash
30 < 45/day
Limit: downtime
Vapor Phase Reflow & Wash: capacity 30/day vs demand 45/day. Main limit: downtime. Raw C/T 10.7 min, effective C/T 13.4 min.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€316,350
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
3.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Polyimide flex lamina…
6-Layer Rigid-Flex Poly…
3x / week · LT 5d
PRODUCTION CONTROL / ERP
MES
Feeder Setup Campaign
CUSTOMER
Space & Defense Primes
45 boards/d
Takt: 10.0 min
EDI / Daily ESD
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
54
1.20 d
Drag to reorder step 1
SMT LINE A
1. Vacuum Bakeout &…
×1
Continuous Flow
C/T
5.6 min
C/O
25 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
36 / 1d
OEE
87.2%
i
Insert a step here
+
I
63
1.40 d
Drag to reorder step 2
SMT LINE A
2. IPC Class-3 SMD …
×2
Push Flow
C/T
8.2 min
C/O
35 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
36 / 2d
OEE
80.0%
i
Insert a step here
+
I
81
1.80 d
SMED
SMED Offl…
Drag to reorder step 3
REFLOW/AOI
3. Vapor Phase Refl…
×2
BOTTLENECK
C/T
10.7 min
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
45 / 2d
OEE
72.1%
i
Insert a step here
+
I
45
1.00 d
Drag to reorder step 4
BACK-END THT
4. RTV Silicone Vib…
×2
FIFO Lane
C/T
7.8 min
C/O
18 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
18 / 1d
OEE
82.1%
i
FIFO
Insert a step here
+
I
36
0.80 d
Drag to reorder step 5
BOX BUILD
5. Thermal Shock & …
×3
FIFO Lane
C/T
6.8 min
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
11 / 1d
OEE
81.1%
i
Insert a step at the end
+
I
54
1.20 d
Finished Goods
OUT
1.20 d
VA 5.6 min
1.40 d
VA 8.2 min
1.80 d
VA 10.7 min
1.00 d
VA 7.8 min
0.80 d
VA 6.8 min
1.20 d
Total Lead Time
7.49 d
VA Time
39.1 min
PCE
1.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step