Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Tri-Temp Burn-In & Automated IC Final Test
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
10 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
150°C Dynamic HTOL Burn-In
23,095 < 32,000/day
Limit: downtime
150°C Dynamic HTOL Burn-In: capacity 23,095/day vs demand 32,000/day. Main limit: downtime. Raw C/T 2.7 s, effective C/T 3.4 s.
Quality (RTY)
86.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€456,960
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
129,254.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Foundry OSAT Outputs
Packaged Un-Tested ICs
2x / week · LT 14d
PRODUCTION CONTROL / ERP
MES
Photolitho Bottleneck Queue
CUSTOMER
Automotive Safety Tie…
32,000 units/d
Takt: 2.5 s
EDI / Clean Nitrogen Pack
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
51,200
1.60 d
Drag to reorder step 1
CLEANROOM BAY 1
1. Socket Load & Gr…
×1
FIFO Lane
C/T
1.8 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
32000 / 2d
OEE
93.7%
i
FIFO
Insert a step here
+
I
83,200
2.60 d
KANBAN
FOUP Purg…
Drag to reorder step 2
LITHO CLEANROOM
2. 150°C Dynamic HT…
×2
BOTTLENECK
C/T
2.7 s
C/O
35 min
Availability
83%
Quality FPY
94.8%
Batch / EPEI
38400 / 2d
OEE
77.0%
i
Insert a step here
+
I
60,800
1.90 d
Drag to reorder step 3
ETCH BAY
3. Cold -40°C Param…
×2
Push Flow
C/T
2.1 s
C/O
25 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
25600 / 2d
OEE
85.6%
i
Insert a step here
+
I
48,000
1.50 d
Drag to reorder step 4
METAL CMP
4. Laser Brand & Vi…
×2
Push Flow
C/T
2.0 s
C/O
20 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
19200 / 1d
OEE
87.9%
i
Insert a step here
+
I
35,200
1.10 d
Drag to reorder step 5
DIE SORT
5. Vacuum Dry-Pack …
×2
FIFO Lane
C/T
1.6 s
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
12800 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
48,000
1.50 d
Finished Goods
OUT
1.60 d
VA 1.8 s
2.60 d
VA 2.7 s
1.90 d
VA 2.1 s
1.50 d
VA 2.0 s
1.10 d
VA 1.6 s
1.50 d
Total Lead Time
10.2 d
VA Time
10 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step