4000A Solenoid-Operated Automatic Transfer Switch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
22.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fast Dual-Coil Transfer Mech
29 < 40/day
Limit: downtime
Fast Dual-Coil Transfer Mech: capacity 29/day vs demand 40/day. Main limit: downtime. Raw C/T 24.3 min, effective C/T 29.5 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€986,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silver-Tungsten Conta…
Arc Chutes & Solenoid C…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Custom Project Build Push
CUSTOMER
Hospital & Data Cente…
40 units/d
Takt: 22.5 min
EDI / Daily Dedicated
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
68
1.70 d
Drag to reorder step 1
BUSBAR CELL
1. Silver-Alloy Con…
×2
Push Flow
C/T
15.3 min
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
40 / 2d
OEE
91.5%
i
Insert a step here
+
I
60
1.50 d
Drag to reorder step 2
MECH BAY
2. Phenolic Arc Chu…
×3
Push Flow
C/T
17.6 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
24 / 1d
OEE
88.1%
i
Insert a step here
+
I
80
2.00 d
BALANCING
Pre-Cut L…
Drag to reorder step 3
WIRING BAY
3. Fast Dual-Coil T…
×5
BOTTLENECK
C/T
24.3 min
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
16 / 1d
OEE
78.3%
i
Insert a step here
+
I
44
1.10 d
Drag to reorder step 4
AUTOMATION
4. Microprocessor A…
×2
FIFO Lane
C/T
18.0 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
10 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
32
0.80 d
Drag to reorder step 5
HV TEST CAGE
5. 200-Cycle Under-…
×2
FIFO Lane
C/T
14.4 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
8 / 1d
OEE
89.8%
i
Insert a step at the end
+
I
56
1.40 d
Finished Goods
OUT
1.70 d
VA 15.3 min
1.50 d
VA 17.6 min
2.00 d
VA 24.3 min
1.10 d
VA 18.0 min
0.80 d
VA 14.4 min
1.40 d
Total Lead Time
8.60 d
VA Time
1.5 h
PCE
1.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen