Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
22.5 min
Lead Time (LT)
8.60 d
Value-Added
1.5 h
Efficiency (PCE)
1.16%
BottleneckFast Dual-Coil Transfer Mech
29 < 40/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€986,000
Carbon CO₂
14.2 t CO₂e/year