Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated ICE/BEV Cockpit Wire Harness
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
59 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Rotary Conveyor Formboard Build
650 < 920/day
Limit: downtime
Rotary Conveyor Formboard Build: capacity 650/day vs demand 920/day. Main limit: downtime. Raw C/T 63 s, effective C/T 79 s.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€892,584
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
544.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Automotive Terminal S…
Thin-Wall FLRY Wire & P…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
MES
Color/Gauge Campaign Push
CUSTOMER
Vehicle Assembly Line
920 assemblies/d
Takt: 59 s
EDI / Drum Flatbed
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,472
1.60 d
Drag to reorder step 1
ROD MILL
1. Auto Cut-Strip-C…
×2
Continuous Flow
C/T
40 s
C/O
35 min
Availability
94%
Quality FPY
99.2%
Batch / EPEI
1380 / 2d
OEE
90.8%
i
Insert a step here
+
I
1,656
1.80 d
Drag to reorder step 2
STRANDER BAY
2. Ultrasonic Splic…
×2
Push Flow
C/T
48 s
C/O
50 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
1380 / 2d
OEE
86.3%
i
Insert a step here
+
I
2,208
2.40 d
SMED
SMED Dual…
Drag to reorder step 3
CCV TOWER
3. Rotary Conveyor …
×3
BOTTLENECK
C/T
63 s
C/O
95 min
Availability
83%
Quality FPY
96.4%
Batch / EPEI
1840 / 3d
OEE
75.8%
i
Insert a step here
+
I
1,288
1.40 d
Drag to reorder step 4
ARMOR LINE
4. Clip, Conduit & …
×2
Push Flow
C/T
46 s
C/O
30 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
920 / 2d
OEE
88.7%
i
Insert a step here
+
I
828
0.90 d
Drag to reorder step 5
DRUM TEST
5. Vision Fuse & Pu…
×2
FIFO Lane
C/T
35 s
C/O
12 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
460 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
1,656
1.80 d
Finished Goods
OUT
1.60 d
VA 40 s
1.80 d
VA 48 s
2.40 d
VA 63 s
1.40 d
VA 46 s
0.90 d
VA 35 s
1.80 d
Total Lead Time
9.90 d
VA Time
3.9 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step