Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
57 s
Lead Time (LT)
7.20 d
Value-Added
3.7 min
Efficiency (PCE)
0.06%
BottleneckTwin-Shot Elastomer Overmold
677 < 950/day
Limit: downtime
Quality (RTY)
90.4%
WIP Capital
€943,920
Carbon CO₂
67.2 t CO₂e/year