Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
2D Area-Imager Rugged Warehouse RF Scanner
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Twin-Shot Elastomer Overmold
677 < 950/day
Limit: downtime
Twin-Shot Elastomer Overmold: capacity 677/day vs demand 950/day. Main limit: downtime. Raw C/T 61 s, effective C/T 75 s.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€943,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
67.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Optics & Trigger Mold
TPE Drop Shell & Scan E…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
ERP
SKU Firmware Lot Batch
CUSTOMER
3PL Fulfillment Wareh…
950 units/d
Takt: 57 s
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,235
1.30 d
Drag to reorder step 1
PREP CELL
1. 2D Scan Engine A…
×2
Push Flow
C/T
36 s
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
570 / 1d
OEE
92.3%
i
Insert a step here
+
I
1,140
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. Trigger Microswi…
×4
FIFO Lane
C/T
48 s
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
285 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
1,520
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. Twin-Shot Elasto…
×3
BOTTLENECK
C/T
61 s
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
238 / 1d
OEE
76.4%
i
Insert a step here
+
I
855
0.90 d
Drag to reorder step 4
FINISH LINE
4. UHF RFID Antenna…
×2
FIFO Lane
C/T
42 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
238 / 1d
OEE
90.5%
i
FIFO
Insert a step here
+
I
665
0.70 d
Drag to reorder step 5
RETAIL PACK
5. Concrete 2m Tumb…
×3
Continuous Flow
C/T
32 s
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
190 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
1,425
1.50 d
Finished Goods
OUT
1.30 d
VA 36 s
1.20 d
VA 48 s
1.60 d
VA 61 s
0.90 d
VA 42 s
0.70 d
VA 32 s
1.50 d
Total Lead Time
7.20 d
VA Time
3.7 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step