Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
400kWh Grid Liquid-Cooled LFP Battery Rack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.54%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Rack String BMS & Pyro Fuse
22 < 30/day
Limit: downtime
Rack String BMS & Pyro Fuse: capacity 22/day vs demand 30/day. Main limit: downtime. Raw C/T 32.4 min, effective C/T 39.3 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,717,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
314Ah LFP Cell Plants
Steel Racks & Glycol Ch…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
BMS/MES
Custom Project Build Push
CUSTOMER
Utility Storage Conta…
30 units/d
Takt: 30.0 min
EDI / Daily Dedicated
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
51
1.70 d
Drag to reorder step 1
BUSBAR CELL
1. Module Glycol Tr…
×2
Push Flow
C/T
20.4 min
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
30 / 2d
OEE
91.5%
i
Insert a step here
+
I
45
1.50 d
Drag to reorder step 2
MECH BAY
2. 314Ah Cell Laser…
×3
Push Flow
C/T
23.4 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
18 / 1d
OEE
88.1%
i
Insert a step here
+
I
60
2.00 d
BALANCING
Pre-Cut L…
Drag to reorder step 3
WIRING BAY
3. Rack String BMS …
×5
BOTTLENECK
C/T
32.4 min
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
12 / 1d
OEE
78.3%
i
Insert a step here
+
I
33
1.10 d
Drag to reorder step 4
AUTOMATION
4. Glycol Manifold …
×2
FIFO Lane
C/T
24.0 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
8 / 1d
OEE
86.2%
i
FIFO
Insert a step here
+
I
24
0.80 d
Drag to reorder step 5
HV TEST CAGE
5. SOC Balancing & …
×2
FIFO Lane
C/T
19.2 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
6 / 1d
OEE
89.8%
i
Insert a step at the end
+
I
42
1.40 d
Finished Goods
OUT
1.70 d
VA 20.4 min
1.50 d
VA 23.4 min
2.00 d
VA 32.4 min
1.10 d
VA 24.0 min
0.80 d
VA 19.2 min
1.40 d
Total Lead Time
8.63 d
VA Time
2.0 h
PCE
1.54%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step