Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
8.2 min
Lead Time (LT)
8.60 d
Value-Added
32.6 min
Efficiency (PCE)
0.84%
BottleneckThyristor Switching Board
38 < 55/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€984,900
Carbon CO₂
19.5 t CO₂e/year