Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.1 h
Lead Time (LT)
8.78 d
Value-Added
4.3 h
Efficiency (PCE)
3.24%
BottleneckVacuum Epoxy Casting Cure
10 < 14/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€1,725,500
Carbon CO₂
5.0 t CO₂e/year