Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
40Gbps Cat8 S/FTP Data Center Patch Trunk
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
39 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Al Foil Wrap & 4-Pair Braid
998 < 1,400/day
Limit: downtime
Al Foil Wrap & 4-Pair Braid: capacity 998/day vs demand 1,400/day. Main limit: downtime. Raw C/T 41 s, effective C/T 51 s.
Quality (RTY)
92.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€665,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
827.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
OFHC Bare Copper Wire
FEP Foam Core & Al Poly…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Color/Gauge Campaign Push
CUSTOMER
Hyperscale Switch Fab…
1,400 units/d
Takt: 39 s
EDI / Drum Flatbed
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
2,240
1.60 d
Drag to reorder step 1
ROD MILL
1. Dual Gas-Injecte…
×2
Continuous Flow
C/T
26 s
C/O
35 min
Availability
94%
Quality FPY
99.2%
Batch / EPEI
2100 / 2d
OEE
90.8%
i
Insert a step here
+
I
2,520
1.80 d
Drag to reorder step 2
STRANDER BAY
2. High-Speed Pair …
×2
Push Flow
C/T
32 s
C/O
50 min
Availability
91%
Quality FPY
98.5%
Batch / EPEI
2100 / 2d
OEE
86.3%
i
Insert a step here
+
I
3,360
2.40 d
SMED
SMED Dual…
Drag to reorder step 3
CCV TOWER
3. Al Foil Wrap & 4…
×3
BOTTLENECK
C/T
41 s
C/O
95 min
Availability
83%
Quality FPY
96.4%
Batch / EPEI
2800 / 3d
OEE
75.8%
i
Insert a step here
+
I
1,960
1.40 d
Drag to reorder step 4
ARMOR LINE
4. LSZH Jacket & RJ…
×2
Push Flow
C/T
30 s
C/O
30 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
1400 / 2d
OEE
88.7%
i
Insert a step here
+
I
1,260
0.90 d
Drag to reorder step 5
DRUM TEST
5. Cable Analyzer 2…
×2
FIFO Lane
C/T
23 s
C/O
12 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
700 / 1d
OEE
93.8%
i
Insert a step at the end
+
I
2,520
1.80 d
Finished Goods
OUT
1.60 d
VA 26 s
1.80 d
VA 32 s
2.40 d
VA 41 s
1.40 d
VA 30 s
0.90 d
VA 23 s
1.80 d
Total Lead Time
9.90 d
VA Time
2.5 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step