Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.7 min
Lead Time (LT)
9.92 d
Value-Added
18.7 min
Efficiency (PCE)
0.21%
BottleneckOutdoor Black PE Oversheath
135 < 190/day
Limit: downtime
Quality (RTY)
92.3%
WIP Capital
€235,125
Carbon CO₂
112.4 t CO₂e/year