350kW Liquid-Cooled EV Highway Fast Charger
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.64 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.64%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Liquid-Cooled Cable Plumbed
20 < 28/day
Limit: downtime
Liquid-Cooled Cable Plumbed: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 42.1 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,046,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
9.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
SiC 30kW Rectifier Br…
Outdoor Cabinets & Liqu…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Custom Project Build Push
CUSTOMER
CPO Highway Charge Ne…
28 units/d
Takt: 32.1 min
EDI / Daily Dedicated
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
48
1.71 d
Drag to reorder step 1
BUSBAR CELL
1. Weatherproof IP5…
×2
Push Flow
C/T
21.9 min
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
28 / 2d
OEE
91.5%
i
Insert a step here
+
I
42
1.50 d
Drag to reorder step 2
MECH BAY
2. Power Stack SiC …
×3
Push Flow
C/T
25.1 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
17 / 1d
OEE
88.2%
i
Insert a step here
+
I
56
2.00 d
BALANCING
Pre-Cut L…
Drag to reorder step 3
WIRING BAY
3. Liquid-Cooled Ca…
×5
BOTTLENECK
C/T
34.7 min
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
11 / 1d
OEE
78.2%
i
Insert a step here
+
I
31
1.11 d
Drag to reorder step 4
AUTOMATION
4. OCPP 2.0.1 Modem…
×2
FIFO Lane
C/T
25.7 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
7 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
22
0.79 d
Drag to reorder step 5
HV TEST CAGE
5. 350kW Regenerati…
×2
FIFO Lane
C/T
20.6 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
6 / 1d
OEE
90.1%
i
Insert a step at the end
+
I
39
1.39 d
Finished Goods
OUT
1.71 d
VA 21.9 min
1.50 d
VA 25.1 min
2.00 d
VA 34.7 min
1.11 d
VA 25.7 min
0.79 d
VA 20.6 min
1.39 d
Total Lead Time
8.64 d
VA Time
2.1 h
PCE
1.64%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step