Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
8.64 d
Value-Added
2.1 h
Efficiency (PCE)
1.64%
BottleneckLiquid-Cooled Cable Plumbed
20 < 28/day
Limit: downtime
Quality (RTY)
90.3%
WIP Capital
€3,046,400
Carbon CO₂
9.9 t CO₂e/year