Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
13.2 min
Lead Time (LT)
9.94 d
Value-Added
52.3 min
Efficiency (PCE)
0.58%
Bottleneck85% Tinned Copper Braiding
48 < 68/day
Limit: downtime
Quality (RTY)
92.3%
WIP Capital
€1,108,800
Carbon CO₂
40.2 t CO₂e/year