Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
6.9 min
Lead Time (LT)
8.78 d
Value-Added
27.7 min
Efficiency (PCE)
0.70%
BottleneckOptical Illumination Fiber Pack
42 < 65/day
Limit: downtime
Quality (RTY)
86.3%
WIP Capital
€1,360,800
Carbon CO₂
23.1 t CO₂e/year