Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.8 min
Lead Time (LT)
10.2 d
Value-Added
11.4 min
Efficiency (PCE)
0.12%
BottleneckElectron-Beam Gate Litho
226 < 320/day
Limit: downtime
Quality (RTY)
86.8%
WIP Capital
€6,201,600
Carbon CO₂
1,292.5 t CO₂e/year