Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
ISO-15197 Connected Bluetooth Blood Glucometer
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
50 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
LCD Glass & Elastomer Pad
2,990 < 4,200/day
Limit: downtime
LCD Glass & Elastomer Pad: capacity 2,990/day vs demand 4,200/day. Main limit: downtime. Raw C/T 14 s, effective C/T 17 s.
Quality (RTY)
90.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€423,360
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
297.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Analog Front-End Chips
Gold-Plated Strip Conne…
2x / week · LT 7d
PRODUCTION CONTROL / ERP
MES
SKU Firmware Lot Batch
CUSTOMER
Pharmacy & Diabetes C…
4,200 units/d
Takt: 13 s
EDI / Daily Air/Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
5,460
1.30 d
Drag to reorder step 1
PREP CELL
1. Medical ABS Shel…
×2
Push Flow
C/T
8.2 s
C/O
15 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
2520 / 1d
OEE
92.3%
i
Insert a step here
+
I
5,040
1.20 d
Drag to reorder step 2
ASSY U-CELL
2. Low-Leakage Stri…
×4
FIFO Lane
C/T
11 s
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
1260 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
6,720
1.60 d
AUTOMATION
Parallel …
Drag to reorder step 3
TEST STATION
3. LCD Glass & Elas…
×3
BOTTLENECK
C/T
14 s
C/O
15 min
Availability
86%
Quality FPY
95.2%
Batch / EPEI
1050 / 1d
OEE
76.4%
i
Insert a step here
+
I
3,780
0.90 d
Drag to reorder step 4
FINISH LINE
4. Control Strip Pr…
×2
FIFO Lane
C/T
9.5 s
C/O
8 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
1050 / 1d
OEE
90.5%
i
FIFO
Insert a step here
+
I
2,940
0.70 d
Drag to reorder step 5
RETAIL PACK
5. ISO Accuracy Lot…
×3
Continuous Flow
C/T
7.2 s
C/O
6 min
Availability
98%
Quality FPY
99.6%
Batch / EPEI
840 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
6,300
1.50 d
Finished Goods
OUT
1.30 d
VA 8.2 s
1.20 d
VA 11 s
1.60 d
VA 14 s
0.90 d
VA 9.5 s
0.70 d
VA 7.2 s
1.50 d
Total Lead Time
7.20 d
VA Time
50 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step