Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Adaptive Pixel-LED Automotive Headlamp Matrix
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
49 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Heatpipe Die-Cast Heatsink
758 < 1,100/day
Limit: downtime
Heatpipe Die-Cast Heatsink: capacity 758/day vs demand 1,100/day. Main limit: downtime. Raw C/T 53 s, effective C/T 67 s.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,866,150
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
390.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Multi-LED Suppliers
Silicone Lenses & Al Di…
Weekly · LT 8d
PRODUCTION CONTROL / ERP
ERP
Cleanroom Batch Traveler
CUSTOMER
Tier-1 Auto Lighting
1,100 units/d
Takt: 49 s
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
1,980
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Micro-LED Pixel …
×2
Push Flow
C/T
35 s
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
1100 / 2d
OEE
88.9%
i
Insert a step here
+
I
2,090
1.90 d
Drag to reorder step 2
VACUUM COATER
2. LSR Liquid Silic…
×1
Push Flow
C/T
41 s
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
1320 / 2d
OEE
83.2%
i
Insert a step here
+
I
2,310
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. Heatpipe Die-Cas…
×2
BOTTLENECK
C/T
53 s
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
550 / 1d
OEE
74.4%
i
Insert a step here
+
I
1,100
1.00 d
Drag to reorder step 4
SEAL BAY
4. CAN Stepper & Po…
×2
FIFO Lane
C/T
37 s
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
330 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
770
0.70 d
Drag to reorder step 5
METROLOGY
5. Goniophotometer …
×2
Continuous Flow
C/T
30 s
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
220 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
1,320
1.20 d
Finished Goods
OUT
1.80 d
VA 35 s
1.90 d
VA 41 s
2.10 d
VA 53 s
1.00 d
VA 37 s
0.70 d
VA 30 s
1.20 d
Total Lead Time
8.70 d
VA Time
3.3 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step