Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Three-Phase Industrial VFD Inverter Gate Board
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
59 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Double-Wave & Pin Check
653 < 920/day
Limit: downtime
Double-Wave & Pin Check: capacity 653/day vs demand 920/day. Main limit: downtime. Raw C/T 63 s, effective C/T 79 s.
Quality (RTY)
88.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€578,680
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
71.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Power Module Suppliers
2oz Cu Boards & Optocou…
3x / week · LT 5d
PRODUCTION CONTROL / ERP
ERP
Feeder Setup Campaign
CUSTOMER
Motor Drive Factories
920 boards/d
Takt: 59 s
EDI / Daily ESD
MRP / 3x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,104
1.20 d
Drag to reorder step 1
SMT LINE A
1. Heavy Solder Ste…
×1
Continuous Flow
C/T
33 s
C/O
25 min
Availability
95%
Quality FPY
98.6%
Batch / EPEI
736 / 1d
OEE
90.4%
i
Insert a step here
+
I
1,288
1.40 d
Drag to reorder step 2
SMT LINE A
2. SMD & Transforme…
×2
Push Flow
C/T
48 s
C/O
35 min
Availability
91%
Quality FPY
97.4%
Batch / EPEI
736 / 2d
OEE
84.3%
i
Insert a step here
+
I
1,656
1.80 d
SMED
SMED Offl…
Drag to reorder step 3
REFLOW/AOI
3. Double-Wave & Pi…
×2
BOTTLENECK
C/T
63 s
C/O
45 min
Availability
84%
Quality FPY
95.4%
Batch / EPEI
920 / 2d
OEE
76.1%
i
Insert a step here
+
I
920
1.00 d
Drag to reorder step 4
BACK-END THT
4. HV Creeping Clea…
×2
FIFO Lane
C/T
46 s
C/O
18 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
368 / 1d
OEE
86.7%
i
FIFO
Insert a step here
+
I
736
0.80 d
Drag to reorder step 5
BOX BUILD
5. 3.5kV Opto Isola…
×3
FIFO Lane
C/T
40 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
230 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
1,104
1.20 d
Finished Goods
OUT
1.20 d
VA 33 s
1.40 d
VA 48 s
1.80 d
VA 63 s
1.00 d
VA 46 s
0.80 d
VA 40 s
1.20 d
Total Lead Time
7.40 d
VA Time
3.8 min
PCE
0.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step