Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Power 976nm Fiber-Coupled Pump Diode
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.72 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Multi-Emitter Knife Prism
179 < 260/day
Limit: downtime
Multi-Emitter Knife Prism: capacity 179/day vs demand 260/day. Main limit: downtime. Raw C/T 3.7 min, effective C/T 4.7 min.
Quality (RTY)
86.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,085,760
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
92.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
GaAs Laser Bars
AlN Ceramic Submounts
Weekly · LT 8d
PRODUCTION CONTROL / ERP
MES
Cleanroom Batch Traveler
CUSTOMER
Fiber Laser Cutting O…
260 units/d
Takt: 3.5 min
EDI / ESD Clean Box
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
468
1.80 d
Drag to reorder step 1
OPTICS LAB
1. Indium/AuSn Bar …
×2
Push Flow
C/T
2.5 min
C/O
30 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
260 / 2d
OEE
88.9%
i
Insert a step here
+
I
494
1.90 d
Drag to reorder step 2
VACUUM COATER
2. Fast-Axis Micro-…
×1
Push Flow
C/T
2.9 min
C/O
45 min
Availability
90%
Quality FPY
96.5%
Batch / EPEI
312 / 2d
OEE
83.2%
i
Insert a step here
+
I
546
2.10 d
AUTOMATION
6-DOF Pie…
Drag to reorder step 3
PHOTONICS BAY
3. Multi-Emitter Kn…
×2
BOTTLENECK
C/T
3.7 min
C/O
25 min
Availability
84%
Quality FPY
93.8%
Batch / EPEI
130 / 1d
OEE
74.4%
i
Insert a step here
+
I
260
1.00 d
Drag to reorder step 4
SEAL BAY
4. 105um Fiber Coup…
×2
FIFO Lane
C/T
2.6 min
C/O
15 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
78 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
182
0.70 d
Drag to reorder step 5
METROLOGY
5. 48h LIV Optical …
×2
Continuous Flow
C/T
2.1 min
C/O
8 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
52 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
312
1.20 d
Finished Goods
OUT
1.80 d
VA 2.5 min
1.90 d
VA 2.9 min
2.10 d
VA 3.7 min
1.00 d
VA 2.6 min
0.70 d
VA 2.1 min
1.20 d
Total Lead Time
8.72 d
VA Time
13.9 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step