Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Withdrawable 4000A Low-Voltage MCC Lineup
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.66 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Smart Starter Relay Wiring
25 < 35/day
Limit: downtime
Smart Starter Relay Wiring: capacity 25/day vs demand 35/day. Main limit: downtime. Raw C/T 27.8 min, effective C/T 33.7 min.
Quality (RTY)
90.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,166,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
12.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Drawer Unit Suppliers
Galvanized Cells & Cu R…
2x / week · LT 6d
PRODUCTION CONTROL / ERP
ERP
Custom Project Build Push
CUSTOMER
Process & Mining Plan…
35 units/d
Takt: 25.7 min
EDI / Daily Dedicated
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
60
1.71 d
Drag to reorder step 1
BUSBAR CELL
1. Main Horizontal …
×2
Push Flow
C/T
17.5 min
C/O
25 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
35 / 2d
OEE
91.5%
i
Insert a step here
+
I
53
1.51 d
Drag to reorder step 2
MECH BAY
2. Withdrawable Dra…
×3
Push Flow
C/T
20.1 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
21 / 1d
OEE
88.1%
i
Insert a step here
+
I
70
2.00 d
BALANCING
Pre-Cut L…
Drag to reorder step 3
WIRING BAY
3. Smart Starter Re…
×5
BOTTLENECK
C/T
27.8 min
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
14 / 1d
OEE
78.3%
i
Insert a step here
+
I
39
1.11 d
Drag to reorder step 4
AUTOMATION
4. Fieldbus Profibu…
×2
FIFO Lane
C/T
20.6 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
9 / 1d
OEE
86.1%
i
FIFO
Insert a step here
+
I
28
0.80 d
Drag to reorder step 5
HV TEST CAGE
5. Secondary Inject…
×2
FIFO Lane
C/T
16.5 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
7 / 1d
OEE
89.8%
i
Insert a step at the end
+
I
49
1.40 d
Finished Goods
OUT
1.71 d
VA 17.5 min
1.51 d
VA 20.1 min
2.00 d
VA 27.8 min
1.11 d
VA 20.6 min
0.80 d
VA 16.5 min
1.40 d
Total Lead Time
8.66 d
VA Time
1.7 h
PCE
1.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step