Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.1 min
Lead Time (LT)
7.42 d
Value-Added
16.0 min
Efficiency (PCE)
0.24%
BottleneckNitrogen Convection + AXI
156 < 220/day
Limit: downtime
Quality (RTY)
88.8%
WIP Capital
€944,240
Carbon CO₂
17.1 t CO₂e/year